Backup · Recovery detail

01 Biological Filter Saturation — P/T (priority) · recovered after wrong procedure(s)

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (P/T (priority))

HypothesisPTP/T
1. CDRA LiOH Canister Saturation ▸0.255120.0213
2. RWGSR Malfunction ▸0.204120.0170
3. Emergency O2 System Maintenance ▸0.12880.0159
4. Biological Filter Saturation ★ ▸0.255250.0102
5. CDRA Failure0.043150.0029
6. Loss of Pressure0.031120.0026
7. Electrolysis System Failure0.084350.0024
8. Main Cabin Fan Failure0.00030.0000
9. Reduced Main Cabin Fan #1 Capacity0.00040.0000
10. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
11. PDU 4 Failure0.00060.0000
12. PDU 5 Failure0.00060.0000
13. Fuel Cell Degrade0.00080.0000
14. Fuel Cell Failure0.00080.0000
15. MOXIE Antenna Failure0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: CDRA LiOH Canister Saturation → RWGSR Malfunction → Emergency O2 System Maintenance → Biological Filter Saturation

TTR: 61.1 min · attempts 4 · wrong 3