Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. CDRA Failure ★ ▸ | 0.234 | 15 | 0.0156 |
| 2. CDRA LiOH Canister Saturation | 0.155 | 12 | 0.0129 |
| 3. RWGSR Malfunction | 0.125 | 12 | 0.0104 |
| 4. Main Cabin Fan Failure | 0.030 | 3 | 0.0100 |
| 5. Emergency O2 System Maintenance | 0.079 | 8 | 0.0099 |
| 6. Biological Filter Saturation | 0.155 | 25 | 0.0062 |
| 7. Excess CO2 in Cabin | 0.079 | 20 | 0.0040 |
| 8. PDU 4 Failure | 0.016 | 6 | 0.0027 |
| 9. PDU 5 Failure | 0.016 | 6 | 0.0027 |
| 10. Excess Water Vapor Pressure in Cabin | 0.038 | 15 | 0.0025 |
| 11. Loss of Pressure | 0.019 | 12 | 0.0016 |
| 12. Electrolysis System Failure | 0.052 | 35 | 0.0015 |
| 13. Reduced Main Cabin Fan #1 Capacity | 0.000 | 4 | 0.0000 |
| 14. TCCS Auxiliary Fan at Reduced Capacity | 0.000 | 4 | 0.0000 |
| 15. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: CDRA Failure
TTR: 16.1 min · attempts 1 · wrong 0