Backup · Recovery detail

02 CDRA Failure — P/T (priority) · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (P/T (priority))

HypothesisPTP/T
1. CDRA Failure ★ ▸0.234150.0156
2. CDRA LiOH Canister Saturation0.155120.0129
3. RWGSR Malfunction0.125120.0104
4. Main Cabin Fan Failure0.03030.0100
5. Emergency O2 System Maintenance0.07980.0099
6. Biological Filter Saturation0.155250.0062
7. Excess CO2 in Cabin0.079200.0040
8. PDU 4 Failure0.01660.0027
9. PDU 5 Failure0.01660.0027
10. Excess Water Vapor Pressure in Cabin0.038150.0025
11. Loss of Pressure0.019120.0016
12. Electrolysis System Failure0.052350.0015
13. Reduced Main Cabin Fan #1 Capacity0.00040.0000
14. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
15. Fuel Cell Degrade0.00080.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: CDRA Failure

TTR: 16.1 min · attempts 1 · wrong 0