Backup · Recovery detail

04 Electrolysis System Failure — P/T (priority) · recovered after wrong procedure(s)

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (P/T (priority))

HypothesisPTP/T
1. Emergency O2 System Maintenance ▸0.19280.0240
2. RWGSR Malfunction ▸0.172120.0143
3. Electrolysis System Failure ★ ▸0.287350.0082
4. CDRA LiOH Canister Saturation0.095120.0079
5. CDRA Failure0.063150.0042
6. Loss of Pressure0.049120.0041
7. Biological Filter Saturation0.095250.0038
8. WRS Maintenance0.049140.0035
9. Main Cabin Fan Failure0.00030.0000
10. Reduced Main Cabin Fan #1 Capacity0.00040.0000
11. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
12. PDU 4 Failure0.00060.0000
13. PDU 5 Failure0.00060.0000
14. Fuel Cell Degrade0.00080.0000
15. Fuel Cell Failure0.00080.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Emergency O2 System Maintenance → RWGSR Malfunction → Electrolysis System Failure

TTR: 58.3 min · attempts 3 · wrong 2