Backup · Recovery detail

05 Emergency O2 System Maintenance — P/T (priority) · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (P/T (priority))

HypothesisPTP/T
1. Emergency O2 System Maintenance ★ ▸0.27480.0342
2. CDRA LiOH Canister Saturation0.137120.0114
3. RWGSR Malfunction0.110120.0091
4. CDRA Failure0.090150.0060
5. Loss of Pressure0.068120.0057
6. Biological Filter Saturation0.137250.0055
7. Electrolysis System Failure0.184350.0052
8. Main Cabin Fan Failure0.00030.0000
9. Reduced Main Cabin Fan #1 Capacity0.00040.0000
10. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
11. PDU 4 Failure0.00060.0000
12. PDU 5 Failure0.00060.0000
13. Fuel Cell Degrade0.00080.0000
14. Fuel Cell Failure0.00080.0000
15. MOXIE Antenna Failure0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Emergency O2 System Maintenance

TTR: 9.4 min · attempts 1 · wrong 0