Backup · Recovery detail

02 CDRA Failure — Highest P first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Highest P first)

HypothesisPTP/T
1. CDRA Failure ★ ▸0.234150.0156
2. CDRA LiOH Canister Saturation0.155120.0129
3. Biological Filter Saturation0.155250.0062
4. RWGSR Malfunction0.125120.0104
5. Emergency O2 System Maintenance0.07980.0099
6. Excess CO2 in Cabin0.079200.0040
7. Electrolysis System Failure0.052350.0015
8. Excess Water Vapor Pressure in Cabin0.038150.0025
9. Main Cabin Fan Failure0.03030.0100
10. Loss of Pressure0.019120.0016
11. PDU 4 Failure0.01660.0027
12. PDU 5 Failure0.01660.0027
13. Reduced Main Cabin Fan #1 Capacity0.00040.0000
14. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
15. Fuel Cell Degrade0.00080.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: CDRA Failure

TTR: 16.1 min · attempts 1 · wrong 0