Backup · Recovery detail

04 Electrolysis System Failure — Highest P first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Highest P first)

HypothesisPTP/T
1. Electrolysis System Failure ★ ▸0.287350.0082
2. Emergency O2 System Maintenance0.19280.0240
3. RWGSR Malfunction0.172120.0143
4. CDRA LiOH Canister Saturation0.095120.0079
5. Biological Filter Saturation0.095250.0038
6. CDRA Failure0.063150.0042
7. Loss of Pressure0.049120.0041
8. WRS Maintenance0.049140.0035
9. Main Cabin Fan Failure0.00030.0000
10. Reduced Main Cabin Fan #1 Capacity0.00040.0000
11. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
12. PDU 4 Failure0.00060.0000
13. PDU 5 Failure0.00060.0000
14. Fuel Cell Degrade0.00080.0000
15. Fuel Cell Failure0.00080.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Electrolysis System Failure

TTR: 36.3 min · attempts 1 · wrong 0