Backup · Recovery detail

17 Main Cabin Fan Failure — Highest P first · recovered after wrong procedure(s)

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Highest P first)

HypothesisPTP/T
1. Excess Water Vapor Pressure in Cabin ▸0.450150.0300
2. Main Cabin Fan Failure ★ ▸0.35630.1186
3. CDRA Failure0.074150.0049
4. PDU 4 Failure0.04760.0078
5. PDU 5 Failure0.04760.0078
6. Reduced Main Cabin Fan #1 Capacity0.02740.0067
7. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
8. Emergency O2 System Maintenance0.00080.0000
9. Fuel Cell Degrade0.00080.0000
10. Fuel Cell Failure0.00080.0000
11. CDRA LiOH Canister Saturation0.000120.0000
12. Loss of Pressure0.000120.0000
13. MOXIE Antenna Failure0.000120.0000
14. MOXIE ECM Failure0.000120.0000
15. MOXIE Fan Failure0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Excess Water Vapor Pressure in Cabin → Main Cabin Fan Failure

TTR: 20.1 min · attempts 2 · wrong 1