Backup · Recovery detail

18 N2 Tank Burst — Highest P first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Highest P first)

HypothesisPTP/T
1. N2 Tank Burst ★ ▸0.565120.0471
2. Loss of Pressure0.435120.0362
3. Main Cabin Fan Failure0.00030.0000
4. Reduced Main Cabin Fan #1 Capacity0.00040.0000
5. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
6. PDU 4 Failure0.00060.0000
7. PDU 5 Failure0.00060.0000
8. Emergency O2 System Maintenance0.00080.0000
9. Fuel Cell Degrade0.00080.0000
10. Fuel Cell Failure0.00080.0000
11. CDRA LiOH Canister Saturation0.000120.0000
12. MOXIE Antenna Failure0.000120.0000
13. MOXIE ECM Failure0.000120.0000
14. MOXIE Fan Failure0.000120.0000
15. RWGSR Malfunction0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: N2 Tank Burst

TTR: 13.0 min · attempts 1 · wrong 0