Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. RWGSR Malfunction ★ ▸ | 0.254 | 12 | 0.0212 |
| 2. CDRA LiOH Canister Saturation | 0.204 | 12 | 0.0170 |
| 3. Biological Filter Saturation | 0.204 | 25 | 0.0081 |
| 4. Electrolysis System Failure | 0.153 | 35 | 0.0044 |
| 5. Emergency O2 System Maintenance | 0.102 | 8 | 0.0127 |
| 6. CDRA Failure | 0.033 | 15 | 0.0022 |
| 7. Loss of Pressure | 0.025 | 12 | 0.0021 |
| 8. WRS Maintenance | 0.025 | 14 | 0.0018 |
| 9. Main Cabin Fan Failure | 0.000 | 3 | 0.0000 |
| 10. Reduced Main Cabin Fan #1 Capacity | 0.000 | 4 | 0.0000 |
| 11. TCCS Auxiliary Fan at Reduced Capacity | 0.000 | 4 | 0.0000 |
| 12. PDU 4 Failure | 0.000 | 6 | 0.0000 |
| 13. PDU 5 Failure | 0.000 | 6 | 0.0000 |
| 14. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 15. Fuel Cell Failure | 0.000 | 8 | 0.0000 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: RWGSR Malfunction
TTR: 13.1 min · attempts 1 · wrong 0