Backup · Recovery detail

23 SPE System Maintenance — Highest P first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Highest P first)

HypothesisPTP/T
1. SPE System Maintenance ★ ▸1.000200.0500
2. Main Cabin Fan Failure0.00030.0000
3. Reduced Main Cabin Fan #1 Capacity0.00040.0000
4. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
5. PDU 4 Failure0.00060.0000
6. PDU 5 Failure0.00060.0000
7. Emergency O2 System Maintenance0.00080.0000
8. Fuel Cell Degrade0.00080.0000
9. Fuel Cell Failure0.00080.0000
10. CDRA LiOH Canister Saturation0.000120.0000
11. Loss of Pressure0.000120.0000
12. MOXIE Antenna Failure0.000120.0000
13. MOXIE ECM Failure0.000120.0000
14. MOXIE Fan Failure0.000120.0000
15. N2 Tank Burst0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: SPE System Maintenance

TTR: 21.0 min · attempts 1 · wrong 0