Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. Electrolysis System Failure | 0.084 | 35 | 0.0024 |
| 2. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 3. PDU 5 Failure | 0.000 | 6 | 0.0000 |
| 4. N2 Tank Burst | 0.000 | 12 | 0.0000 |
| 5. Excess CO2 in Cabin | 0.000 | 20 | 0.0000 |
| 6. Biological Filter Saturation | 0.248 | 25 | 0.0099 |
| 7. Excess Water Vapor Pressure in Cabin | 0.015 | 15 | 0.0010 |
| 8. WRS Off-nominal pH Level | 0.000 | 19 | 0.0000 |
| 9. TCCS Auxiliary Fan at Reduced Capacity | 0.000 | 4 | 0.0000 |
| 10. MOXIE ECM Failure | 0.000 | 12 | 0.0000 |
| 14. CDRA LiOH Canister Saturation ★ ▸ | 0.248 | 12 | 0.0206 |
| 16. Emergency O2 System Maintenance ▸ | 0.124 | 8 | 0.0155 |
| 25. Main Cabin Fan Failure ▸ | 0.012 | 3 | 0.0041 |
| 27. CDRA Failure ▸ | 0.040 | 15 | 0.0027 |
| 30. Loss of Pressure ▸ | 0.031 | 12 | 0.0026 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: CDRA Failure → Loss of Pressure → Main Cabin Fan Failure → Emergency O2 System Maintenance → CDRA LiOH Canister Saturation
TTR: 55.1 min · attempts 5 · wrong 4