Backup · Recovery detail

08 Excess Water Vapor Pressure in Cabin — Random · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Random)

HypothesisPTP/T
1. Electrolysis System Failure0.000350.0000
2. Fuel Cell Degrade0.00080.0000
3. PDU 5 Failure0.08160.0135
4. N2 Tank Burst0.000120.0000
5. Excess CO2 in Cabin0.000200.0000
6. Biological Filter Saturation0.000250.0000
7. Excess Water Vapor Pressure in Cabin ★0.405150.0270
8. WRS Off-nominal pH Level0.000190.0000
9. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
10. MOXIE ECM Failure0.000120.0000
11. Reduced Main Cabin Fan #1 Capacity0.00040.0000
12. TCCS Filter Clog0.000180.0000
13. SPE System Maintenance0.000200.0000
14. CDRA LiOH Canister Saturation0.000120.0000
27. CDRA Failure ▸0.119150.0079

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: CDRA Failure

TTR: 16.1 min · attempts 1 · wrong 0