Backup · Recovery detail

18 N2 Tank Burst — Random · recovered after wrong procedure(s)

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Random)

HypothesisPTP/T
1. Electrolysis System Failure0.000350.0000
2. Fuel Cell Degrade0.00080.0000
3. PDU 5 Failure0.00060.0000
4. N2 Tank Burst ★ ▸0.565120.0471
5. Excess CO2 in Cabin0.000200.0000
6. Biological Filter Saturation0.000250.0000
7. Excess Water Vapor Pressure in Cabin0.000150.0000
8. WRS Off-nominal pH Level0.000190.0000
9. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
10. MOXIE ECM Failure0.000120.0000
11. Reduced Main Cabin Fan #1 Capacity0.00040.0000
12. TCCS Filter Clog0.000180.0000
13. SPE System Maintenance0.000200.0000
14. CDRA LiOH Canister Saturation0.000120.0000
30. Loss of Pressure ▸0.435120.0362

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Loss of Pressure → N2 Tank Burst

TTR: 26.0 min · attempts 2 · wrong 1