Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. Electrolysis System Failure | 0.000 | 35 | 0.0000 |
| 2. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 3. PDU 5 Failure ▸ | 0.095 | 6 | 0.0159 |
| 4. N2 Tank Burst | 0.000 | 12 | 0.0000 |
| 5. Excess CO2 in Cabin | 0.000 | 20 | 0.0000 |
| 6. Biological Filter Saturation | 0.000 | 25 | 0.0000 |
| 7. Excess Water Vapor Pressure in Cabin | 0.000 | 15 | 0.0000 |
| 8. WRS Off-nominal pH Level | 0.000 | 19 | 0.0000 |
| 9. TCCS Auxiliary Fan at Reduced Capacity | 0.095 | 4 | 0.0238 |
| 10. MOXIE ECM Failure | 0.000 | 12 | 0.0000 |
| 11. Reduced Main Cabin Fan #1 Capacity ▸ | 0.023 | 4 | 0.0058 |
| 12. TCCS Filter Clog | 0.095 | 18 | 0.0053 |
| 13. SPE System Maintenance | 0.000 | 20 | 0.0000 |
| 21. TCCS Auxiliary Fan #1 Failure ▸ | 0.127 | 20 | 0.0063 |
| 29. TCCS Auxiliary Fan #2 Failure ★ | 0.288 | 20 | 0.0144 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: PDU 5 Failure → Reduced Main Cabin Fan #1 Capacity → TCCS Auxiliary Fan #1 Failure
TTR: 33.1 min · attempts 3 · wrong 2