Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. Electrolysis System Failure | 0.000 | 35 | 0.0000 |
| 2. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 3. PDU 5 Failure ▸ | 0.040 | 6 | 0.0067 |
| 4. N2 Tank Burst | 0.000 | 12 | 0.0000 |
| 5. Excess CO2 in Cabin | 0.000 | 20 | 0.0000 |
| 6. Biological Filter Saturation | 0.000 | 25 | 0.0000 |
| 7. Excess Water Vapor Pressure in Cabin | 0.000 | 15 | 0.0000 |
| 8. WRS Off-nominal pH Level | 0.000 | 19 | 0.0000 |
| 9. TCCS Auxiliary Fan at Reduced Capacity ▸ | 0.092 | 4 | 0.0229 |
| 10. MOXIE ECM Failure | 0.000 | 12 | 0.0000 |
| 11. Reduced Main Cabin Fan #1 Capacity | 0.092 | 4 | 0.0229 |
| 12. TCCS Filter Clog ★ | 0.366 | 18 | 0.0204 |
| 21. TCCS Auxiliary Fan #1 Failure ▸ | 0.121 | 20 | 0.0060 |
| 26. Fuel Cell #1 and PDU Failure ▸ | 0.040 | 14 | 0.0029 |
| 31. Trace Contaminants ▸ | 0.092 | 20 | 0.0046 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: TCCS Auxiliary Fan at Reduced Capacity → TCCS Auxiliary Fan #1 Failure → PDU 5 Failure → Trace Contaminants → Fuel Cell #1 and PDU Failure
TTR: — · attempts 5 · wrong 5