Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. Main Cabin Fan Failure ▸ | 0.012 | 3 | 0.0041 |
| 2. Reduced Main Cabin Fan #1 Capacity | 0.000 | 4 | 0.0000 |
| 3. TCCS Auxiliary Fan at Reduced Capacity | 0.000 | 4 | 0.0000 |
| 4. PDU 4 Failure | 0.000 | 6 | 0.0000 |
| 5. PDU 5 Failure | 0.000 | 6 | 0.0000 |
| 6. Emergency O2 System Maintenance ▸ | 0.124 | 8 | 0.0155 |
| 7. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 8. Fuel Cell Failure | 0.000 | 8 | 0.0000 |
| 9. CDRA LiOH Canister Saturation ★ ▸ | 0.248 | 12 | 0.0206 |
| 10. RWGSR Malfunction | 0.198 | 12 | 0.0165 |
| 11. Loss of Pressure | 0.031 | 12 | 0.0026 |
| 12. MOXIE Antenna Failure | 0.000 | 12 | 0.0000 |
| 13. MOXIE ECM Failure | 0.000 | 12 | 0.0000 |
| 14. MOXIE Fan Failure | 0.000 | 12 | 0.0000 |
| 15. N2 Tank Burst | 0.000 | 12 | 0.0000 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: Main Cabin Fan Failure → Emergency O2 System Maintenance → CDRA LiOH Canister Saturation
TTR: 26.1 min · attempts 3 · wrong 2