Module activation
| Hypothesis | P | T | P/T |
|---|---|---|---|
| 1. Main Cabin Fan Failure | 0.000 | 3 | 0.0000 |
| 2. Reduced Main Cabin Fan #1 Capacity | 0.000 | 4 | 0.0000 |
| 3. TCCS Auxiliary Fan at Reduced Capacity | 0.000 | 4 | 0.0000 |
| 4. PDU 4 Failure | 0.000 | 6 | 0.0000 |
| 5. PDU 5 Failure | 0.000 | 6 | 0.0000 |
| 6. Emergency O2 System Maintenance ▸ | 0.192 | 8 | 0.0240 |
| 7. Fuel Cell Degrade | 0.000 | 8 | 0.0000 |
| 8. Fuel Cell Failure | 0.000 | 8 | 0.0000 |
| 9. RWGSR Malfunction ▸ | 0.172 | 12 | 0.0143 |
| 10. CDRA LiOH Canister Saturation ▸ | 0.095 | 12 | 0.0079 |
| 11. Loss of Pressure ▸ | 0.049 | 12 | 0.0041 |
| 12. MOXIE Antenna Failure | 0.000 | 12 | 0.0000 |
| 13. MOXIE ECM Failure | 0.000 | 12 | 0.0000 |
| 16. WRS Maintenance ▸ | 0.049 | 14 | 0.0035 |
| 31. Electrolysis System Failure ★ | 0.287 | 35 | 0.0082 |
15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision
Sequence: Emergency O2 System Maintenance → RWGSR Malfunction → CDRA LiOH Canister Saturation → Loss of Pressure → WRS Maintenance
TTR: — · attempts 5 · wrong 5