Backup · Recovery detail

05 Emergency O2 System Maintenance — Shortest T first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Shortest T first)

HypothesisPTP/T
1. Main Cabin Fan Failure0.00030.0000
2. Reduced Main Cabin Fan #1 Capacity0.00040.0000
3. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
4. PDU 4 Failure0.00060.0000
5. PDU 5 Failure0.00060.0000
6. Emergency O2 System Maintenance ★ ▸0.27480.0342
7. Fuel Cell Degrade0.00080.0000
8. Fuel Cell Failure0.00080.0000
9. CDRA LiOH Canister Saturation0.137120.0114
10. RWGSR Malfunction0.110120.0091
11. Loss of Pressure0.068120.0057
12. MOXIE Antenna Failure0.000120.0000
13. MOXIE ECM Failure0.000120.0000
14. MOXIE Fan Failure0.000120.0000
15. N2 Tank Burst0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Emergency O2 System Maintenance

TTR: 9.4 min · attempts 1 · wrong 0