Backup · Recovery detail

12 Fuel Cell Failure — Shortest T first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Shortest T first)

HypothesisPTP/T
1. Main Cabin Fan Failure0.00030.0000
2. Reduced Main Cabin Fan #1 Capacity0.00040.0000
3. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
4. PDU 4 Failure0.00060.0000
5. PDU 5 Failure0.00060.0000
6. Fuel Cell Failure ★ ▸0.84780.1059
7. Fuel Cell Degrade0.05180.0064
8. Emergency O2 System Maintenance0.00080.0000
9. CDRA LiOH Canister Saturation0.000120.0000
10. Loss of Pressure0.000120.0000
11. MOXIE Antenna Failure0.000120.0000
12. MOXIE ECM Failure0.000120.0000
13. MOXIE Fan Failure0.000120.0000
14. N2 Tank Burst0.000120.0000
15. RWGSR Malfunction0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: Fuel Cell Failure

TTR: 9.2 min · attempts 1 · wrong 0