Backup · Recovery detail

14 MOXIE Antenna Failure — Shortest T first · recovered on first procedure

Module activation

Module activation

Score distribution

Score distribution

Ranking at first decision (Shortest T first)

HypothesisPTP/T
1. Main Cabin Fan Failure0.00030.0000
2. Reduced Main Cabin Fan #1 Capacity0.00040.0000
3. TCCS Auxiliary Fan at Reduced Capacity0.00040.0000
4. PDU 4 Failure0.00060.0000
5. PDU 5 Failure0.00060.0000
6. Emergency O2 System Maintenance0.00080.0000
7. Fuel Cell Degrade0.00080.0000
8. Fuel Cell Failure0.00080.0000
9. MOXIE Antenna Failure ★ ▸1.000120.0833
10. CDRA LiOH Canister Saturation0.000120.0000
11. Loss of Pressure0.000120.0000
12. MOXIE ECM Failure0.000120.0000
13. MOXIE Fan Failure0.000120.0000
14. N2 Tank Burst0.000120.0000
15. RWGSR Malfunction0.000120.0000

15 of 31 · ★ truth · ▸ attempted · highlight = first pick · P=0 if unscored at first decision

Sequence: MOXIE Antenna Failure

TTR: 13.5 min · attempts 1 · wrong 0